Asbestos removal demand being challenged by RJE over Taralga wind farm switch room material
An Australian company that unwittingly constructed portable buildings using asbestos-contaminated materials from China is fighting demands it remove the deadly substance.
In the Industrial Relations Commission, Adelaide-based Robin Johnson Engineering (RJE) is challenging a SafeWork NSW order that tainted flooring be removed from a switch room at the Taralga wind farm, south-west of Sydney. For more on this story, follow the link below.
Posted in News